Preliminary Program: Friday (9/18)
Last updated: 8/21/98 3:16:57 PM
|
Invited Lecture |
TIME / ROOM: |
Friday, September 18, 8:00-9:00 AM (Ballroom D&E) |
TITLE: |
Enlarging the Questions and Energizing the Solutions in Managing Infrastructure Risks |
Speaker |
Rae Zimmerman, Professor of Planning and Public Administration, New York University, Director, Urban Planning Program, Director, Institute for Civil Infrastructure Systems |
SESSION NUMBER: |
5.1.1 |
TIME / ROOM: |
Friday (9/18) 9:00AM - 10:30AM (Alvin) |
TITLE: |
PRA Concepts and Algorithms |
CHAIR: |
D.C. Bley, Buttonwood Consulting, USA |
PRESENTER |
Title/Authors |
Wreathall |
Study of a Plant Walkdown Procedure Utilizing a Plant-Specific Probabilistic Safety Assessment |
Majumdar |
A Graded Approach for Initiating Event Selection in a Facility Hazard Analysis |
Hanayasu |
Structural Change Analysis of Accident Situation by Frequency-Magnitude Curve |
Jøsang |
Reliability Analysis with Uncertain Probabilities |
SESSION NUMBER: |
5.1.2 |
TIME / ROOM: |
Friday (9/18) 9:00AM - 10:30AM (Broadway) |
TITLE: |
International Developments |
CHAIR: |
J.M. Lanore, IPSN/DES, France |
PRESENTER |
Title/Authors |
Cunningham |
Current Developments in the Use of Probabilistic Risk Assessment in Nuclear Reactor Regulation |
Trainor |
Practical Application of Risk Assessment Studies in a Regulatory Context |
Cassidy |
Developments in UK Regulatory Use of Risk Criteria |
Kaufer |
OECD Nuclear Energy Agency Activities in Risk Assessment |
SESSION NUMBER: |
5.1.3 |
TIME / ROOM: |
Friday (9/18) 9:00AM - 10:30AM (Carnegie) |
TITLE: |
Use of PSA for Risk Management and Operations |
CHAIR: |
N. Ortiz, SNL, USA |
PRESENTER |
Title/Authors |
Fleishman |
Probabilistic Safety Criteria |
Brereton |
Risk Management Plan for the National Ignition Facility |
Burns |
Probabilistic Safety Assessment in a Goal-Setting Environment |
Kumano |
Pilot Study of RIIST for a Typical Japanese 3-Loop PWR Plant |
SESSION NUMBER: |
5.1.4 |
TIME / ROOM: |
Friday (9/18) 9:00AM - 10:30AM (Juilliard) |
TITLE: |
CHATROOM - Unifying Principles of Probabilistic Risk Analysis |
CHAIR: |
A. Mosleh, U. of Maryland, USA |
PRESENTER |
Title/Authors |
Mosleh |
Discussion Leader |
SESSION NUMBER: |
5.1.5 |
TIME / ROOM: |
Friday (9/18) 9:00AM - 10:30AM (Uris) |
TITLE: |
Security Risk Assessment |
CHAIR: |
J. Zamanali, Lucent Technologies, USA |
PRESENTER |
Title/Authors |
Riviera |
Practical Application of Qualitative and Quantitative Risk Management Methods to Aviation Security |
Homsy |
A Strategic Framework for Managing the Risk of Terrorist Use of Weapons of Mass Destruction |
Ozier |
Critical Infrastructures - An Illustration of National Risk Profiles |
Hicks |
Cost and Performance Analysis of Physical Security Systems |
SESSION NUMBER: |
5.1.6 |
TIME / ROOM: |
Friday (9/18) 9:00AM - 10:30AM (Shubert) |
TITLE: |
Techniques for Occupational Safety Assessment |
CHAIR: |
D. Gertman, INEEL, USA |
PRESENTER |
Title/Authors |
Konkel |
Electrical Potential Transfer Through Grounding and the Concern for Facility and Worker Safety |
Hulet |
Deleterious Exposures to Health and Safety Professionals |
Grozdanovic |
Expert Estimation of Work Conditions |
Bayley |
Evaluation of Worker Risk at a Chemical Agent Disposal Facility |
SESSION NUMBER: |
5.1.7 |
TIME / ROOM: |
Friday (9/18) 9:00AM - 10:30AM (Regency) |
TITLE: |
Nuclear Reactor Accident Modeling |
CHAIR: |
J. Rempe, INEEL, USA |
PRESENTER |
Title/Authors |
Knudson |
Factors Influencing the Potential for Steam Generator Tube Rupture in Pressurized Water Reactors |
Rempe |
Impact of Uncertainties on the Response of an Externally Flooded Vessel |
Esmaili |
Initial Experimental Assessment of ADAM Pre-Core Damage Thermal-Hydraulic Models |
Esmaili |
Initial Experimental Assessment of ADAM Severe Accident Models |
SESSION NUMBER: |
5.1.8 |
TIME / ROOM: |
Friday (9/18) 9:00AM - 10:30AM (Majestic) |
TITLE: |
Online Operation Support |
CHAIR: |
I. Kim, Hanyang University, Korea |
PRESENTER |
Title/Authors |
Golay |
An Advisory Baysian Belief Network-Based Expert System for On-line Component Monitoring |
imic |
Experience with Making a Complete On-Line Risk Monitoring Model |
CarrolL |
On-Line Risk Management with ORAM-SENTINEL at Duke Power Company |
|
CLOSING SESSION |
TIME / ROOM: |
Friday (9/18) 10:45AM - 12:15PM (Conference Level) |
Panel | Conclusions and Insights from the Conference Moderator: Ali Mosleh |
Closing Remarks |
Robert A. Bari and Ali Mosleh |
Preliminary program last updated: 8/21/98 3:16:57 PM