Preliminary Program: Friday (9/18)

Last updated: 8/21/98 3:16:57 PM

 

Invited Lecture

TIME / ROOM:

Friday, September 18, 8:00-9:00 AM (Ballroom D&E)

TITLE:

Enlarging the Questions and Energizing the Solutions in Managing Infrastructure Risks

Speaker

Rae Zimmerman, Professor of Planning and Public Administration, New York University, Director, Urban Planning Program, Director, Institute for Civil Infrastructure Systems

SESSION NUMBER:

5.1.1

TIME / ROOM:

Friday (9/18) 9:00AM - 10:30AM (Alvin)

TITLE:

PRA Concepts and Algorithms

CHAIR:

D.C. Bley, Buttonwood Consulting, USA

PRESENTER

Title/Authors

Wreathall

Study of a Plant Walkdown Procedure Utilizing a Plant-Specific Probabilistic Safety Assessment
A. Onoue, S. Kojima, J. Wreathall, D.C. Bley

Majumdar

A Graded Approach for Initiating Event Selection in a Facility Hazard Analysis
Kartik Majumdar, Thomas Altenbach

Hanayasu

Structural Change Analysis of Accident Situation by Frequency-Magnitude Curve
Shigeo Hanayasu, Wilson H. Tang

Jøsang

Reliability Analysis with Uncertain Probabilities
Audun Jøsang

SESSION NUMBER:

5.1.2

TIME / ROOM:

Friday (9/18) 9:00AM - 10:30AM (Broadway)

TITLE:

International Developments

CHAIR:

J.M. Lanore, IPSN/DES, France

PRESENTER

Title/Authors

Cunningham

Current Developments in the Use of Probabilistic Risk Assessment in Nuclear Reactor Regulation
Gary M. Holahon, Thomas L. King, Mark A. Cunningham, Gareth W. Parry, Edward G. Rodrick, Harold J. VanderMolden, Mark P. Rubin, Ann M. Ramey-Smith, Michael C. Cheok

Trainor

Practical Application of Risk Assessment Studies in a Regulatory Context
M.T. Trainor

Cassidy

Developments in UK Regulatory Use of Risk Criteria
Keith Cassidy, Neil Morton

Kaufer

OECD Nuclear Energy Agency Activities in Risk Assessment
B. Kaufer, G. Frescura, J. A. Murphy

SESSION NUMBER:

5.1.3

TIME / ROOM:

Friday (9/18) 9:00AM - 10:30AM (Carnegie)

TITLE:

Use of PSA for Risk Management and Operations

CHAIR:

N. Ortiz, SNL, USA

PRESENTER

Title/Authors

Fleishman

Probabilistic Safety Criteria
B. Fleishman

Brereton

Risk Management Plan for the National Ignition Facility
S. Brereton, M. Lane, C. Smith, J. Yatabe

Burns

Probabilistic Safety Assessment in a Goal-Setting Environment
D.J. Burns

Kumano

Pilot Study of RIIST for a Typical Japanese 3-Loop PWR Plant
Kaoru Sakata, Yoshiyuki Narumiya, Koji Ushijima, Tetsuji Kumano, Hidetsugu Morota, Hiroshi Nakamura

SESSION NUMBER:

5.1.4

TIME / ROOM:

Friday (9/18) 9:00AM - 10:30AM (Juilliard)

TITLE:

CHATROOM - Unifying Principles of Probabilistic Risk Analysis

CHAIR:

A. Mosleh, U. of Maryland, USA

PRESENTER

Title/Authors

Mosleh

Discussion Leader
Ali Mosleh

SESSION NUMBER:

5.1.5

TIME / ROOM:

Friday (9/18) 9:00AM - 10:30AM (Uris)

TITLE:

Security Risk Assessment

CHAIR:

J. Zamanali, Lucent Technologies, USA

PRESENTER

Title/Authors

Riviera

Practical Application of Qualitative and Quantitative Risk Management Methods to Aviation Security
Archie M. Riviera, Monica S. Grusche

Homsy

A Strategic Framework for Managing the Risk of Terrorist Use of Weapons of Mass Destruction
Robert V. Homsy

Ozier

Critical Infrastructures - An Illustration of National Risk Profiles
Will Ozier

Hicks

Cost and Performance Analysis of Physical Security Systems
Mary Jane Hicks, David Yates, William H. Jago, Alan W. Phillips

SESSION NUMBER:

5.1.6

TIME / ROOM:

Friday (9/18) 9:00AM - 10:30AM (Shubert)

TITLE:

Techniques for Occupational Safety Assessment

CHAIR:

D. Gertman, INEEL, USA

PRESENTER

Title/Authors

Konkel

Electrical Potential Transfer Through Grounding and the Concern for Facility and Worker Safety
Herbert Konkel

Hulet

Deleterious Exposures to Health and Safety Professionals
Michael W. Hulet, Gary R. Wright

Grozdanovic

Expert Estimation of Work Conditions
Miroljub Grozdanovic, Branislav Andjelkovic, Nenad Zivkovic

Bayley

Evaluation of Worker Risk at a Chemical Agent Disposal Facility
S.E. Bayley, L.B. Robbins

SESSION NUMBER:

5.1.7

TIME / ROOM:

Friday (9/18) 9:00AM - 10:30AM (Regency)

TITLE:

Nuclear Reactor Accident Modeling

CHAIR:

J. Rempe, INEEL, USA

PRESENTER

Title/Authors

Knudson

Factors Influencing the Potential for Steam Generator Tube Rupture in Pressurized Water Reactors
D.L. Knudson, L.S. Ghan

Rempe

Impact of Uncertainties on the Response of an Externally Flooded Vessel
J. L. Rempe, D.L. Knudson, C. L. Atwood, M. J. Cebull

Esmaili

Initial Experimental Assessment of ADAM Pre-Core Damage Thermal-Hydraulic Models
H. Esmaili, R. Vijaykumar, M. Khatib-Rahbar

Esmaili

Initial Experimental Assessment of ADAM Severe Accident Models
H. Esmaili, R. Vijaykumar, M. Khatib-Rahbar

SESSION NUMBER:

5.1.8

TIME / ROOM:

Friday (9/18) 9:00AM - 10:30AM (Majestic)

TITLE:

Online Operation Support

CHAIR:

I. Kim, Hanyang University, Korea

PRESENTER

Title/Authors

Golay

An Advisory Baysian Belief Network-Based Expert System for On-line Component Monitoring
M.W. Golay, J.B. Lee, Y. Sui, C.W. Kang

Šimic

Experience with Making a Complete On-Line Risk Monitoring Model
Zdenko Šimic, Steve M. Follen, Vladimir Mikulicic

CarrolL

On-Line Risk Management with ORAM-SENTINEL at Duke Power Company
B.C. Carroll, P.T. Farish, H.D. Brewer, P.M. Abraham

 

CLOSING SESSION

TIME / ROOM:

Friday (9/18) 10:45AM - 12:15PM (Conference Level)

Panel Conclusions and Insights from the Conference
Moderator: Ali Mosleh

Closing Remarks

Robert A. Bari and Ali Mosleh

Link to: |
Mon | Tue | Wed | Thu | Fri | Author Index | Back to top |

Preliminary program last updated: 8/21/98 3:16:57 PM