Preliminary Program: Wednesday (9/16)
Last updated: 8/21/98 3:16:57 PM
|
PLENARY SESSION |
TIME / ROOM: |
Wednesday (9/16) 9:00AM - 10:30AM (Ball Room D&E) |
CHAIR: |
A. Thadani (US NRC) |
Panelists: | |
R. Beedle (NEI) | |
T. Cloninger (South Texas Project) | |
G. Apostolakis (MIT) | |
S. Chakraborty (Swiss Federal Nuclear Safety Inspectorate) |
SESSION NUMBER: |
3.2.1 |
TIME / ROOM: |
Wednesday (9/16) 10:45AM - 12:15PM (Alvin) |
TITLE: |
Uncertainty Analysis - Techniques and Applications 3 |
CHAIR: |
M.V. Frank, Safety Factor Associates, USA |
PRESENTER |
Title/Authors |
Feliciano Jacomino |
Implementation of a Unified Methodology to Infer Parameter Distributions and Evaluate the Predictive Uncertainty of a Model Used to Simulate Sediment Transport and Water Quality in a Watershed |
Devictor |
Assessment of the Uncertainty About the Pressure Drop Coefficient |
Kampas |
Deconvolution of Variablility and Uncertainty in the Cassini Safety Analysis |
Garnier |
Processing Parameters Variation Studies Using Efficient Monte-Carlo Rare Event Simulation |
SESSION NUMBER: |
3.2.2 |
TIME / ROOM: |
Wednesday (9/16) 10:45AM - 12:15PM (Broadway) |
TITLE: |
Risk-Informed Design of Transportation Systems |
CHAIR: |
B. Martin, British Nuclear Fuels, United Kingdom |
PRESENTER |
Title/Authors |
Samavedam |
Assessment of Buckling Risk in Continuous Welded Rail Tracks |
Lupton |
The Application of a Risk Based Safety Approach to the Preliminary Design of West Rail |
Klimaszewski |
Estimation of Probability of Failure to a Helicopter's Main Rotor Blade Under Combat Conditions |
SESSION NUMBER: |
3.2.3 |
TIME / ROOM: |
Wednesday (9/16) 10:45AM - 12:15PM (Carnegie) |
TITLE: |
Risk Impacts from Plant and PSA Upgrades |
CHAIR: |
E. Hollo, VEIKI Inst. for Electric Power Research, Hungary |
PRESENTER |
Title/Authors |
Sorel |
Benefits of Re-drafting and Updating the EDF 1300 MW Nuclear Power Plant PSA |
Kovács |
Level 1 PSA Results for Safety Upgrading of J.Bohunice V1 NPP |
Versteeg |
PSA & Backfitting of the Borssele Nuclear Power Plant |
Balfanz |
Risk Based Management, Probabilistic Safety Assessment (Living PSA), Total Safety Management - How Do They interact? |
SESSION NUMBER: |
3.2.4 |
TIME / ROOM: |
Wednesday (9/16) 10:45AM - 12:15PM (Juilliard) |
TITLE: |
Probabilistic Methods Applied to Waste Management |
CHAIR: |
B. Sagar, Southwest Research Inst., USA |
PRESENTER |
Title/Authors |
Bennet |
Determining the Appropriate Spatial Scale for Managing Environmental Risks |
Lemos |
Kd Determination Using Fuzzy Sets Theory |
Maxwell |
Management in the Face of the Unknown Known: On the Use of Groundwater Driven Health Risk Assessment in Contaminated Waste Site Management |
Smidts |
Risk Assessment of Radioactive Waste Repositories: A Biased Monte Carlo Simulation for the Transport of Radionuclide Chains |
SESSION NUMBER: |
3.2.5 |
TIME / ROOM: |
Wednesday (9/16) 10:45AM - 12:15PM (Uris) |
TITLE: |
ROUNDTABLE - Operator Reliability and Safety Assessment in Highly Automated Environments: Task Analysis Methods, Models and Data |
Discussion Leaders: | |
Y. Fujita (Mitsubishi Atomic Power Industries) | |
J. Wreathall (WreathWood Group) |
SESSION NUMBER: |
3.2.6 |
TIME / ROOM: |
Wednesday (9/16) 10:45AM - 12:15PM (Shubert) |
TITLE: |
Risk Management in Aviation |
CHAIR: |
S. Bayley, SAIC, USA |
PRESENTER |
Title/Authors |
Luxhoj |
Risk-Based Decisionmaking for Aviation Safety Using Bayesian Belief Networks |
Smith |
Risks to Third Parties in the Vicinity of Airports |
Ale |
The Management of Third Party Risk Around a Major Airport |
Piers |
Models for the Assessment of Third Party Risk Due to Aircraft Accidents in the Vicinity of Airports |
SESSION NUMBER: |
3.2.7 |
TIME / ROOM: |
Wednesday (9/16) 10:45AM - 12:15PM (Regency) |
TITLE: |
ROUNDTABLE - Risk-Based Analysis of Operational Events |
Participants: | |
J.W. Minarick (SAIC) | |
H.S. Blackman (INEEL) | |
P. Kafka (GRS) | |
P.D. O'Reilly (US NRC) | |
D.M. Rasmuson (US NRC) | |
M.B. Sattison (INEEL) |
SESSION NUMBER: |
3.2.8 |
TIME / ROOM: |
Wednesday (9/16) 10:45AM - 12:15PM (Majestic) |
TITLE: |
On the Interaction of Social Science and Technology in Risk Assessment |
CHAIR: |
D. Okrent, UCLA, USA |
PRESENTER |
Title/Authors |
Okrent |
On the Interaction of Social Science and Technology in Risk Management |
Charnley |
A Systematic, Comprehensive Framework for Environmental Health Risk Management |
North |
Informing the People's Discretion About Environmental Risks: Can This Challenge Be Met? |
Pidgeon |
Stakeholders, Decisions and Risk |
SESSION NUMBER: |
3.3.1 |
TIME / ROOM: |
Wednesday (9/16) 1:30PM - 3:00PM (Alvin) |
TITLE: |
Risk and Safety Based Design - Methodology |
CHAIR: |
N. Siu, US NRC, USA |
PRESENTER |
Title/Authors |
Desille |
Conception Optimization Based on the Definition of Availability Allocations Taken into Account Costs Constraints |
Cooper |
Structured Design and Assessment of Safety Systems Based on Principles |
Martin |
The Influence of Probabilistic Safety Assessment on Design- Experience from the BNFL Sellafield MOX Plant |
Cornford |
Managing Risk as a Resource Using the Defect Detection and Prevention Process |
SESSION NUMBER: |
3.3.2 |
TIME / ROOM: |
Wednesday (9/16) 1:30PM - 3:00PM (Broadway) |
TITLE: |
Risk Comparisons in Decision Making |
CHAIR: |
R. Hall, BNL, USA |
PRESENTER |
Title/Authors |
Knochenhauer |
The Problem of Comparability - Making Judgements Based on PSA Results |
Chhibber |
A Perspective on Risk in the Chemical Process and Nuclear Fuel Enrichment Industries |
Hirschberg |
Health and Environmental Risk Assessment of Energy Systems in Support of Decision-Making |
Wells |
Incorporating Institutional Issues in Environmental Decision Making |
SESSION NUMBER: |
3.3.3 |
TIME / ROOM: |
Wednesday (9/16) 1:30PM - 3:00PM (Carnegie) |
TITLE: |
Licensing and Regulatory Applications of PSA |
CHAIR: |
G. Parry, US NRC, USA |
PRESENTER |
Title/Authors |
Julin |
Regulatory Applications of PSA in Finland |
Schubert |
The Use of PSA Methods for Licensing and Regulatory Processes at HEW |
Sandve |
On Risk Based Regulation |
De Gelder |
Insights and Lessons from PSA for Nuclear Power Plants: Experience of the Belgian Regulatory Body |
SESSION NUMBER: |
3.3.4 |
TIME / ROOM: |
Wednesday (9/16) 1:30PM - 3:00PM (Juilliard) |
TITLE: |
Decision Analysis in Waste Management Applications |
CHAIR: |
N. Eisenberg, US NRC, USA |
PRESENTER |
Title/Authors |
Boyd |
Development of a Comprehensive Risk Management Program for the Chemical Stockpile Disposal Program |
Okrent |
On the Need for Policy Regarding Risks Arising Hundreds and Thousands of Years in the Future from Hazardous Waste Disposal Sites and Municipal Landfills |
Gross |
Application of a Systems-Level Model in Support of Performance-Based Management on the WIPP Project |
Eisenberg |
Importance Measures for Nuclear Waste Repositories |
SESSION NUMBER: |
3.3.5 |
TIME / ROOM: |
Wednesday (9/16) 1:30PM - 3:00PM (Uris) |
TITLE: |
ROUNDTABLE - New Generation HRA Techniques |
CHAIR: |
A. Ramey-Smith, US NRC, USA |
Panelists: | |
O. Strater (GRS) | |
J. Forester (SNL) | |
J. Wreathall (The WreathWood Group) | |
D. Gertmann (INEEL) |
SESSION NUMBER: |
3.3.6 |
TIME / ROOM: |
Wednesday (9/16) 1:30PM - 3:00PM (Shubert) |
TITLE: |
Expert Judgment Methods and Applications 1 |
CHAIR: |
G. Cojazzi, EC, JRC, Italy |
PRESENTER |
Title/Authors |
Cojazzi |
The Context of the Phase I of the Benchmark Exercise on Expert Judgement Techniques in Level 2 PSA: The JRC FARO L-24 Experiment |
Hofer |
Application of a Formal Expert Judgement Methodology to Forecast Results of a Fuel-Coolant Interaction Experiment |
Coe |
The NNC Expert Judgment Methodology and Its Use in the Prediction of Some Results of the FARO L-24 Test |
Pulkkinen |
A Formal Expert Judgement Methodology and its Application to the Prediction of the Results of a Fuel Coolant Interaction Experiment |
SESSION NUMBER: |
3.3.7 |
TIME / ROOM: |
Wednesday (9/16) 1:30PM - 3:00PM (Regency) |
TITLE: |
Insights from Chemical and Process PSAs |
CHAIR: |
V. Mubayi, BNL, USA |
PRESENTER |
Title/Authors |
Bayley |
Assessment of Mitigation Features in a Chemical Agent Disposal Facility Using MELCOR |
Dumai |
An Alternative Method for Safety Demonstration of Pressure Cartridges (EED) |
Piccinini |
Integrated Dynamic Decision Analysis of a Gas Drying Plant: Phenomenological Analysis |
Brereton |
Risk Ranking Methodology for Chemical Release Events |
SESSION NUMBER: |
3.3.8 |
TIME / ROOM: |
Wednesday (9/16) 1:30PM - 3:00PM (Majestic) |
TITLE: |
Risk Perception and Public Participation |
CHAIR: |
D. Okrent, UCLA, USA |
PRESENTER |
Title/Authors |
Walker |
Public Perceptions of Risk Associated With Major Technological Hazards: A Contextual View |
Langford |
The Role of Trust and Accountability in Public Perceptions of Risk |
Goble |
Risk-Informed Public Partipation |
Apostolakis |
On Stakeholder Involvement in Environmental Restoration |
SESSION NUMBER: |
3.4.1 |
TIME / ROOM: |
Wednesday (9/16) 3:30PM - 5:00PM (Alvin) |
TITLE: |
Risk Management in Environment, Safety and Health |
CHAIR: |
E.J. Bonano, Beta Corp. International, USA |
PRESENTER |
Title/Authors |
Morosan |
Multi-Attribute Analysis of Alternatives for Hanford Tanks Remediation System |
Barnett |
A Template Approach to Meeting DOE and EPA Requirements for Emergency Management Hazards Assessment Documents |
Pelmuder |
Risk-Informed Decision Making for Remedial Action |
Mubayi |
Prioritization of Environmental, Safety, and Health Issues at Brookhaven National Laboratory |
SESSION NUMBER: |
3.4.2 |
TIME / ROOM: |
Wednesday (9/16) 3:30PM - 5:00PM (Broadway) |
TITLE: |
Analysis and Frequency of Aircraft Crashes |
CHAIR: |
P. Amico, SAIC, USA |
PRESENTER |
Title/Authors |
Haley |
Progression and Advancement of Aircraft Crash Hazard Analysis Models |
Glaser |
Calculation of the Estimated Probability of an Aircraft Crash into a Structure |
Kimura |
Aircraft Crash Hit Analysis of the Decontamination and Waste Treatment Facility (DWTF) at the Lawrence Livermore National Laboratory (LLNL) |
Haley |
Application of Aircraft Crash Hazard Assessment Methods to Various Facilities in the Nuclear Industry |
Bayley |
Aircraft Data Collection and Risk Evaluation for US Army Facilities |
SESSION NUMBER: |
3.4.3 |
TIME / ROOM: |
Wednesday (9/16) 3:30PM - 5:00PM (Carnegie) |
TITLE: |
Risk Considerations in Land Use Planning |
CHAIR: |
M. Christou, EC, JRC, Italy |
PRESENTER |
Title/Authors |
Pauldrach |
Land Use Planning and Risk Consideration - Some Swedish Lessons |
Christou |
Legislative Framework and Guidance Procedures for Land-Use Planning in the European Union |
Papazoglou |
Expansion of an Oil Refinery and Land Use Planning |
Spadoni |
From ARIPAR Project a Tool to Support Land-Use Planning Activities |
SESSION NUMBER: |
3.4.4 |
TIME / ROOM: |
Wednesday (9/16) 3:30PM - 5:00PM (Juilliard) |
TITLE: |
Dynamic Systems Diagnostics |
CHAIR: |
T. Aldemir, Ohio State U., USA |
PRESENTER |
Title/Authors |
Füssel |
Model-Based Fault Detection and Diagnosis Part A: Methods |
Nelles |
Model-Based Fault Detection and Diagnosis Part B: Applications |
Esmaili |
A Much Faster Than Real Time Approach to Accident Diagnostics, Analysis, and Management (ADAM) |
Aldemir |
A Model-Based Probabilistic Approach to Dynamic System Diagnostics |
Samanta |
Diagnostic Systems of Programmable Electronic Systems |
SESSION NUMBER: |
3.4.5 |
TIME / ROOM: |
Wednesday (9/16) 3:30PM - 5:00PM (Uris) |
TITLE: |
Human Performance Data in Safety Analysis, Management, and Regulation |
CHAIR: |
C. Bieder, EDF, France |
PRESENTER |
Title/Authors |
Muramatsu |
Consideration of the Effect of Human Error in a Seismic PSA |
Furuta |
Heuristics for Intention Inferencing in Plant Operation |
Milici |
A Framework for the Identification of Unsafe Actions and Error Forcing Contexts in a Team Setting Using the Dynamic Flowgraph Methodology |
Ramey-Smith |
Thoughts on Using Human Reliability Insights as a Focus for Regulatory Practices |
SESSION NUMBER: |
3.4.6 |
TIME / ROOM: |
Wednesday (9/16) 3:30PM - 5:00PM (Shubert) |
TITLE: |
Expert Judgment Methods and Applications 2 |
CHAIR: |
K. Thompson, Harvard U., USA |
PRESENTER |
Title/Authors |
Cooke |
Joint EC/USNRC Project: Results of Expert Judgement Assessments for the Late Health Effects Models |
Cooper |
Mathematical Relations for Incorporating Subjective Expertise into Safety Analyses |
Cooke |
Evaluation of Weighting Schemes for Expert Judgment Studies |
Leon |
Legal Admissibility vis-a-vis Scientific Acceptability of Expert Judgments in Environmental Management |
SESSION NUMBER: |
3.4.7 |
TIME / ROOM: |
Wednesday (9/16) 3:30PM - 5:00PM (Regency) |
TITLE: |
Transportation Systems Risk Insights |
CHAIR: |
B. Ale, National Inst. For Health and Environmen, The Netherlands |
PRESENTER |
Title/Authors |
Ferguson |
Forecasting Standard View: A Maritime Industry Risk Analysis Tool; and the National Maritime Safety Incident Reporting System: A Maritime Industry Risk Reduction Tool |
Massé |
New Requirements for the Building of Reliability in Civil Aviation |
Steininger |
Risk and Cost Centered Management of DB's Railworks |
Sandquist |
Risk Assessment of High Altitude Free Flight Commercial Aircraft Operations |
SESSION NUMBER: |
3.4.8 |
TIME / ROOM: |
Wednesday (9/16) 3:30PM - 5:00PM (Majestic) |
TITLE: |
Risk Perception and Risk Management |
CHAIR: |
D. Okrent, UCLA, USA |
PRESENTER |
Title/Authors |
Sjöberg |
Understanding the Process and Consequences of Risk Perception |
Belzer |
Staking Out Risk Management |
Paté-Cornell |
Risk Comparison: Uncertainties and Ranking |
Johnson |
What Researchers Think They Know About Risk Perception |
Preliminary program last updated: 8/21/98 3:16:57 PM